Description of Contract
- One (1) Year full coverage
- Emergency Service 7×24,365
- Including all parts, labor and expenses
- Response time is four (4) hours or less
- Contract includes two (2) PM inspections:
- To be performed during normal business hours
- Includes full UPS Electonics and Battery maintenance
- Battery replacement not covered under contract
UPS Preventative Maintenance – Detailed Check List
- Visual Inspection
- insulation, Overheating, Damage
- Cleaning / Air Flow
- Check fans, Door/Compartment seals
- Replace Filters (customer supplied)
- Clean Module
- Check/Record Voltage Waveforms and Currents
- Input/Output, Rectifier, AC&DC Caps
- Power Measurements (on line)
- Output RMS Current (Phase and Neutral)
- Output Peak Current (Phase and Neutral)
- Metering
- DC Volts and Current
- Input Volts/Current
- Output Volts/Current
- Frequency
- Fuses
- Verify type, value, condition
- Synchronizing
- Verify Utility Sync & Transfer to Bypass
- Transfer from Bypass to UPS
- Verify Voltage and Phase Lockout
- Verify Static Bypass Operation
- Control Calibrations
- Check/Adjust as necessary
- Circuit Breakers/Isolators
- Verify Free Travel
- Check Mag/Thermal Settings
- system/Module Safety Parameters
- Check Battery Current Limit *
- Check Input Current Limit *
- Check Overload Levels *
- Check Overtemp Circuits *
* Where possible/available
Battery Preventative Maintenance – Detailed Check List
- Perform safety evaluation of battery, racks, protective equipment and environment. Note and record any discrepancies.
- Record the ambient temperature of the battery room.
- Clean normal cell dirt/dust accumulation. Note: Some environments may not allow for practical management of dust accumulation.
- Inspect each jar for signs of cracks, excessive bulging and leakage.
- Measure and record the full string charging voltage and current.
- Measure and record the AC ripple voltage and current.
- Measure and record the voltage to ground for each string/cabinet.
- Measure and record the float voltage across each cell/jar.
- Measure and record the conductance of each cell/jar.
- Check for corrosion on battery terminals and connectors. Clean as necessary.